Twitter/X

@bscholl: The Symphony high pressure turbine rotor is fully assembled, as are compressor stages 1/2. Current h...

The Symphony high pressure turbine rotor is fully assembled, as are compressor stages 1/2. Current hold-up is a late supplier building the Stage 3 blisk.

This is why we're vertically integrating—legacy suppliers don't move at Boom speed. Next engine will have Boom-made blisks.

Blake Scholl 🛫 (@bscholl)

Monitoring the turbine situation

— https://nitter.net/bscholl/status/2068780108534460878#m