Twitter/X

Steven Mark Ryan posted (2026-08-06) a supercut of Elon Musk’s March 2026 Terafab…

Brief

Steven Mark Ryan shared a supercut of Elon Musk’s March 2026 Terafab announcement on Aug 6, 2026 after a new update, emphasizing Tesla’s plan to site Terafab in Grimes County, Texas and April groundwork for a research fab at Giga Texas North Campus. Tesla claims Terafab will be the largest chip facility, targeting over 1 terawatt of compute/year to meet Tesla and SpaceX demand.

Why it matters

Steven Mark Ryan posted (2026-08-06) a supercut of Elon Musk’s March 2026 Terafab announcement and urged viewers to rewatch it after “today’s EPIC update.”

Key details

  • Tesla says Terafab will be built in Grimes County, Texas, with an April groundbreaking on a research fab at the North Campus of Giga Texas as the precursor to Terafab.
  • Tesla claims both Tesla and SpaceX will need far more chips than current and future global production can supply, and Terafab aims to produce over 1 terawatt of compute per year (author also exclaims “MASS DRIVER ON THE MOON!”).
Source evidence

In case you need a reminder of the INSANE scale and AMBITION of the Terafab project:

I've put together a supecut of Elon Musk's Terafab announcement back in March 2026.

Worth watching again following today's EPIC update.

💪

p.s. MASS DRIVER ON THE MOON!

Video

Tesla (@Tesla)

Terafab will be built in Grimes County, Texas

In April, we broke ground on our research fab on the North Campus of Giga Texas – the precursor to Terafab.

Both Tesla & SpaceX will need far more chips than current & future global production can supply.

This is why we're building the largest chip manufacturing facility ever, with the goal of producing over 1 terawatt of compute per year

The future is built in Texas

spacex.com/updates#terafab

Video

— https://nitter.net/Tesla/status/2085365278276284803#m