Reducing data center construction risk with pay-per-use robotics
Read now
In the data center market, every week lost during construction translates to millions in deferred revenue and delayed market entry.
As facility footprints expand and rack densities climb, traditional layout methods have become a bottleneck that introduces schedule risk. This new case study from HP featuring Brandt demonstrates how robotic automation is solving these high-stakes construction challenges.
This whitepaper explores results from the Temple Data Center project, examining:
Productivity Gains: Printing 1,136 points across 50,000 sq. ft. in 5 hours - achieving a pace 5x faster than manual methods
Cost Efficiency: A pay-per-use model that eliminates the financial burden of idle equipment and monthly subscriptions
Operational Integration: Seamless use of existing Total Stations to leverage current hardware investments without extensive retraining
Risk Mitigation: Improved site safety by reducing the physical strain that leads to back and knee injuries