No body text on file.
Open the original to read the full piece.
Elizabeth Ridlington (associate director and senior policy analyst, Frontier Group) joined host John Farrell (ILSR) in April 2026 to present Frontier Group’s solar permitting scorecard and to explain why streamlined permitting and inspections matter for rooftop solar adoption. Ridlington framed the work around two drivers: the need for much more rooftop solar (clean generation, reduced long‑distance transmission, and resilience when paired with batteries) and the fact that permitting and inspection processes currently add substantial cost and uncertainty—often 20–33% of project cost—making projects more expensive and causing installers and customers to abandon projects.
The conversation moved from installer anecdotes to concrete policy criteria. Ridlington described the “hot mess” of fragmented local rules: multiple unconnected online portals, in‑person application requirements, sequential multi‑department reviews, inconsistent code interpretations even within the same office, and long inspection windows that force technicians to wait on site. She cited examples: a Mesquite, TX median approval of three business days but a 10% tail of five weeks or more; an estimated 25% cancellation rate for Texas projects between application and permit; and installers who raise prices ~10% on average to cover permitting headaches. The scorecard evaluated statewide policies that reduce friction: enabling instant permitting (SolarAPP or Symbium), funding for jurisdictions, statewide or uniform building codes, limits on HOA restrictions (cost/efficiency caps or dollar caps), prohibiting aesthetic review in permit decisions (California and pending Maryland), remote or third‑party inspections (allowed in Delaware, Florida, Georgia, Utah), fee caps, and clear treatment of third‑party ownership (leases/PPAs) so they are not regulated as utilities.
Results: California and Texas scored best (B’s) because both enable near‑instant permitting via different means (automated state/local portals in CA; third‑party reviewers/inspectors and instant permitting options in TX); New Jersey and Colorado scored C’s; most states scored D/F. Ridlington and Farrell agreed that these reforms are low‑risk, high‑reward: they preserve health and safety while lowering costs, increasing competition, and speeding deployment. The episode closes with Ridlington’s intent to repeat the scorecard in two years and both speakers noting that streamlined permitting may help narrow the U.S.–international cost gap and drive far greater rooftop solar adoption.
Permitting and inspection can add roughly one-fifth to one-third (20–33%) to the cost of a rooftop solar installation, and Frontier Group’s scorecard work motivated by that price drag (Elizabeth Ridlington, April 2026).
Open the original to read the full piece.